Guide · New
Multi-Site Lock Rollout: Phasing, Delivery and Handover
A specification says what to buy; a rollout decides when each site gets it. Phase dates, per-site delivery, handover packs and version control.
Knowledge base
24 practical guides for the people who specify, order and install self-storage hardware — from choosing a lock type to planning a multi-site key system.
Published in the last update cycle.
Guide · New
A specification says what to buy; a rollout decides when each site gets it. Phase dates, per-site delivery, handover packs and version control.
Guide · New
What a US specification usually names, who is entitled to issue each document, and what a supplier outside the United States can and cannot provide.
Guide
How unit doors, corridor doors and roll-up doors each change the hardware decision.
Guide
Corrosion behaviour in exposed and coastal sites, and how to specify it.
Guide
Identify 17 mm vs 19 mm, and what to photograph for an accurate quote.
Guide
How each option changes key management, onboarding and staff workload.
Guide
How a shrouded body changes attack resistance, and what it does not fix.
Guide
Keyed alike, keyed different and manager keys — the five answers we ask for.
Guide
Unit count, spare ratio, manager keys and replacement stock in one framework.
Guide
Tenant, group, site, regional and group keys — and what must be decided first.
Guide
Writing a lock specification that survives staff changes and re-orders.
Guide
How each works, how to choose, and why fit is verified on a sample door.
Guide
How a rollout differs from a specification: phase dates, per-site delivery and handover packs.
Guide
Rekey, replace or accept the exposure — cost and risk of each option.
Guide
Keeping the existing key working, and when a full rekey is unavoidable.
Guide
Hardware, inspection routine, record keeping and shift handover.
Guide
Four checks in order, so you replace the right part the first time.
Guide
Nine questions that separate a manufacturer from a trader.
Guide
What each term covers, what it hides, and how to compare on landed cost.
Guide
Dimensions, keying, finish, function, packaging and documentation.
Guide
Phasing by model, validating with samples, and what to do below the threshold.
Guide
What each certification does and does not mean for a US project.
Guide
Why hours are not a service life, and what to ask about a report.
Guide
Door survey, locking points, key plan, overlocks, spares and phasing.
Guide
Corrosion exposure, door types, lock access and key management by unit type.
Guide
What a US specification names, who can issue each document, and what we cannot provide.
The parameters buyers ask about most often, in one place.
| Decision | Option A | Option B | How to choose |
|---|---|---|---|
| Lock type | Disc padlock (hasp door) | Cylinder lock (cam / mortise door) | Look at the door preparation, not the product photo. |
| Material | SS201 | SS304 | Indoor and covered → SS201. Exposed and coastal → SS304. |
| Keying | Keyed alike | Keyed different | Groups under one operator → alike. Maximum tenant separation → different. |
| Access | Keyed | Combination | Facility issues locks → keyed. No key management → combination. |
| Fit confirmation | Drawing | Physical sample | Use the sample. It is the only method that catches a 1 mm hole offset. |
How we have supported facility and door-manufacturer projects. Customer names and volumes are shared under NDA, so this page describes the work rather than naming clients.